The Amazon Fulfilment Centre project, completed in 2020 included 15,000 tonne of structural steel (13,500 tonnes for the main warehouse) which was carried out and completed within a 17-week time frame. The main warehouse structure included 3 levels of floor and roof at a height of 26m.